Official Baja SAE Forums Homepage
Forum Home Forum Home > General > Design Discussion
  New Posts New Posts RSS Feed - Cost Report 1/2 shaft question
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Cost Report 1/2 shaft question

 Post Reply Post Reply
Author
Message
Sattapri View Drop Down
Double Secret Probation
Double Secret Probation


Joined: Feb/22/2017
Location: Idaho
Status: Offline
Points: 9
Post Options Post Options   Thanks (0) Thanks(0)   Quote Sattapri Quote  Post ReplyReply Direct Link To This Post Topic: Cost Report 1/2 shaft question
    Posted: Feb/22/2017 at 6:59pm
In the cost report is the 1/2 shaft included in the CV joints or should we only count the shaft and list the joints separately?

Thanks! 
~SattApri
Back to Top
SIyer View Drop Down
Bolt Sorter
Bolt Sorter


Joined: Feb/15/2016
Location: Vancouver, BC
Status: Offline
Points: 15
Post Options Post Options   Thanks (0) Thanks(0)   Quote SIyer Quote  Post ReplyReply Direct Link To This Post Posted: Feb/23/2017 at 10:54pm
Probably best to ask the judges, but if the assembly is purchased complete, I see no reason that it shouldn't be listed once.
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down



This page was generated in 0.145 seconds.